Manufacturing & Warehouse Distribution equipment, service, rentals & support from Abel Womack, Raymond forklift NE Distributor

Skip to content
  • Online Catalogs
  • Contact
  • Locations
  • Customer Login
  • Cleanrooms & Controlled Environments
  • FANUC Industrial Robots
  • Automated Storage and Retrieval Warehouse Systems
  • Manufacturing Solutions
  • Modular Building Systems
  • Raymond Forklifts
  • Mobile Storage Systems
  • About Us
    • Careers
    • Customer Service Policy
    • Customer Testimonials
    • Discover the Difference
    • Our Locations
    • Management Staff
    • Raymond Solutions & Support Center
  • Forklifts
    • Used Forklifts and Equipment
    • Forklift Rentals and Leases
    • J1-TSV Task Support Vehicle
    • Raymond Basics
    • Power Solutions
  • Parts & Service
    • Equipment Maintenance & Repair
    • Forklift & Conveyor Parts
    • Forklift Safety Training
    • Shop Warehouse Products
    • Tennant Sweepers and Tennant Scrubbers
  • Optimization
    • Fleet and Warehouse Management Solutions
    • Lean Management
    • Labor Management
    • Asset & Maintenance Management
    • Operator Assist Technologies
    • Real Time Location System
  • Robotics
    • Industrial Robots
    • ROBOXX
    • FANUC Robot M-20iA
    • FANUC Robot M-710iC
    • FANUC Robot M-410iB
  • Integrated Systems Solutions
    • Automated Guided Vehicles (AGV)
    • Automated Storage & Retrieval Systems
    • Conveyor Systems and Sortation
    • Deep Lane High Density Pallet Storage
    • Pallet Racking and Shelving
    • Mobile Storage Systems
    • Warehouse Automation and Software
    • Indoor Vertical Growing
    • Modular Building Systems
    • Cleanrooms and Controlled Environments
  • Engineering
    • Automated and Robotic Simulation
    • Facility Design and Layout
    • Project Management
  • Information
    • Blog
    • Case Studies
    • Industry Solutions
    • Videos
    • Media Kit
You are here: Home / News / Warehouse News / Reap the Benefits of Lean Project Delivery

Reap the Benefits of Lean Project Delivery

Peak Season checklist

View original at www.manufacturing.net

Mary Stepnick Todd Alsdorf Today’s marketplace is one of global customers and intense competition. It is vital for manufacturing businesses of all kinds to take advantage of any strategy to improve their ability to respond to market changes through efficient capital improvement projects. One of the most important factors that can help them achieve these goals is reducing the cost of capital associated with construction. Manufacturing leaders are under more pressure today than ever before. That means that they need to bring products to market and change over existing product lines quickly and cost-effectively if they want to enhance their competitive advantage. The construction industry has been mired since the middle of the 20 th century with little to no productivity improvement. The construction industry has struggled to translate technology advances into improved productivity, held back by archaic and highly litigious contracting methodologies that encourage behaviors that are not in the best interest of improving the speed and cost-effective deployment of capital improvement projects. Over the same time period, the manufacturing sector has had significant productivity improvements due to the adoption of new technologies and manufacturing methods, such as Lean Manufacturing, that have resulted in the construction costs of bringing new products to market becoming a larger share of the overall capital improvement project. One new project delivery method attracting attention is Lean Project Delivery (LPD). This approach is based on the same principles of waste and cost reduction that have helped the manufacturing sector achieve tremendous productivity improvement, and transforms the way manufacturing businesses move through their projects. While senior stakeholders can question new and unfamiliar concepts, the potential benefits posed by LPD are worth investigating. Here is an overview of LPD, with particular focus on implementing Conditions of Satisfaction. Essential LPD Elements As with any kind of […]

About the Author

Sue Boczenowski is the Marketing Manager for Abel Womack.

Leave a Reply Cancel reply

You must be logged in to post a comment.

This site uses Akismet to reduce spam. Learn how your comment data is processed.

  • About Us
  • Industry Solutions
  • Blog
  • Products
  • Corporate News
  • Forklift News
  • Warehouse News
  • Contact
  • Twitter
  • Facebook
  • YouTube
  • Linkedin
Raymond_ASASC_2020

Abel Womack - Discover the Difference - logo
1 International Way
Lawrence, MA 01843
800-554-2887

  • Twitter
  • Facebook
  • YouTube
  • Linkedin
  • Home
  • About Us
  • Forklifts
  • Careers
  • Fleet Management Solutions
  • Professional Design & Engineering Services
  • Parts
  • Service
  • Forklift Training
  • Pre-Owned Forklifts
  • Forklift Rentals
  • Products
  • Contact Us
  • Sitemap
  • Privacy Policy
Offices In
Massachusetts
Connecticut
New York
Maine
New Hampshire
Rhode Island
Vermont

Copyright © 2023 · Abel Womack 2.0 on WordPress